{"id":83914,"date":"2026-02-26T18:37:15","date_gmt":"2026-02-27T00:37:15","guid":{"rendered":"https:\/\/www.greaterbelize.com\/?p=83914"},"modified":"2026-02-26T18:37:15","modified_gmt":"2026-02-27T00:37:15","slug":"major-works-planned-for-lake-independence-boulevard","status":"publish","type":"post","link":"https:\/\/www.greaterbelize.com\/major-works-planned-for-lake-independence-boulevard\/","title":{"rendered":"Major Works Planned For Lake Independence Boulevard"},"content":{"rendered":"<p><strong>Two of Belize City\u2019s busiest bridges are about to shut down for major replacements, and that\u2019s putting traffic worries front and center. Drivers will have to rely heavily on the BelChina and Chetumal Street Bridges, raising real questions about whether the <a href=\"https:\/\/archive.channel5belize.com\/archives\/181874\">Lake\u2011I Boulevard approach<\/a> can handle the extra load, especially when rain turns that stretch into a crumbling mess. Deputy Mayor Eluide Miller says the city and the Ministry of Infrastructure Development are already talking long\u2011term fixes. He says quick patchwork is underway, but the ministry has committed to fully rehabilitating the boulevard before the bridge closures kick in. Here\u2019s how he puts it.<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<div id=\"attachment_83882\" style=\"width: 310px\" class=\"wp-caption alignright\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-83882\" class=\"size-medium wp-image-83882\" src=\"https:\/\/www.greaterbelize.com\/wp-content\/uploads\/2026\/02\/vlcsnap-2026-02-26-18h13m01s951-300x169.jpg\" alt=\"Eluide Miller\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.greaterbelize.com\/wp-content\/uploads\/2026\/02\/vlcsnap-2026-02-26-18h13m01s951-300x169.jpg 300w, https:\/\/www.greaterbelize.com\/wp-content\/uploads\/2026\/02\/vlcsnap-2026-02-26-18h13m01s951-1024x576.jpg 1024w, https:\/\/www.greaterbelize.com\/wp-content\/uploads\/2026\/02\/vlcsnap-2026-02-26-18h13m01s951-768x432.jpg 768w, https:\/\/www.greaterbelize.com\/wp-content\/uploads\/2026\/02\/vlcsnap-2026-02-26-18h13m01s951-1536x864.jpg 1536w, https:\/\/www.greaterbelize.com\/wp-content\/uploads\/2026\/02\/vlcsnap-2026-02-26-18h13m01s951-1300x731.jpg 1300w, https:\/\/www.greaterbelize.com\/wp-content\/uploads\/2026\/02\/vlcsnap-2026-02-26-18h13m01s951.jpg 1920w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><p id=\"caption-attachment-83882\" class=\"wp-caption-text\">\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 Eluide Miller<\/p><\/div>\n<p><strong>Eluide Miller, Deputy Mayor, Belize City <\/strong><\/p>\n<p><em>\u201cMy understanding and coming out of the same meeting that we had with MIDH, my understanding is a more permanent fix will be executed to that entire thoroughfare, right? What happened is with the replacement of the BelCan Bridge, the Chetumal &#8211; that bridge and the entire boulevard will become extremely important as it will serve as an alternate route, right. And so MIDH recognizes it. Us at the city, we recognize that this boulevard will need to be completely rehabilitated. They have done some work there recently, as you have seen, and we have promoted that work on our page as well and we remain thankful for it. But a more permanent upgrade to that boulevard is necessary and MIDH has committed to executing that work ahead of the replacement of the BelCan Bridge, as it will again serve as an alternate route into and out the city noh. \u200aAnd so we have received a commitment from MIDH that those works will be done as you have, as we&#8217;ve faced some challenges with that especially when we&#8217;re faced with inclement weather. But we&#8217;re very much happy to hear that are more permanent solution will be executed.\u201d <\/em><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Miller says the real relief will come once that full rebuild of Lake\u2011I Boulevard starts, giving drivers a sturdier route before the bridge shutdowns hit.<\/strong><\/p>\n<p>&nbsp;<\/p>\n<h6>Attention readers: This online newscast is a direct transcript of our evening television broadcast. When speakers use Kriol, we have carefully rendered their words using a standard spelling system.<\/h6>\n<p>&nbsp;<\/p>\n<h4>Watch the full newscast here:<\/h4>\n<p>&nbsp;<\/p>\n<p><iframe loading=\"lazy\" title=\"YouTube video player\" src=\"https:\/\/www.youtube.com\/embed\/Atl-hUaaXwg?si=uFGtgxydnWvgyNEh\" width=\"560\" height=\"315\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Two of Belize City\u2019s busiest bridges are about to shut down for major replacements, and that\u2019s putting traffic worries front and center. Drivers will have to rely heavily on the BelChina and Chetumal Street Bridges, raising real questions about whether the Lake\u2011I Boulevard approach can [&hellip;]<\/p>\n","protected":false},"author":14,"featured_media":83915,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"ngg_post_thumbnail":0,"footnotes":""},"categories":[6438,444,475,474],"tags":[11049,11060],"class_list":["post-83914","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-infrastructure","category-latest-news","category-news","category-people-places","tag-2026-02-26","tag-major-works-planned-for-lake-independence-boulevard"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.greaterbelize.com\/wp-json\/wp\/v2\/posts\/83914","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.greaterbelize.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.greaterbelize.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.greaterbelize.com\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/www.greaterbelize.com\/wp-json\/wp\/v2\/comments?post=83914"}],"version-history":[{"count":1,"href":"https:\/\/www.greaterbelize.com\/wp-json\/wp\/v2\/posts\/83914\/revisions"}],"predecessor-version":[{"id":83917,"href":"https:\/\/www.greaterbelize.com\/wp-json\/wp\/v2\/posts\/83914\/revisions\/83917"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.greaterbelize.com\/wp-json\/wp\/v2\/media\/83915"}],"wp:attachment":[{"href":"https:\/\/www.greaterbelize.com\/wp-json\/wp\/v2\/media?parent=83914"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.greaterbelize.com\/wp-json\/wp\/v2\/categories?post=83914"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.greaterbelize.com\/wp-json\/wp\/v2\/tags?post=83914"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}